People & Business

Selby Gardens’ Master Plan Updates

By  | 

The Master Site Plan will be heard before the City Commission, Monday, October 28 at 1:30 p.m.  It is vital that you attend in person and show your support for Selby Gardens. Please RSVP here and attend wearing your green Selby Gardens’ shirt. You can also sign the Master Plan petition before the meeting! 

If you are out of town and unable to attend, you can watch a live stream of the hearing here. Please note the link will not show the live stream until 1:30 p.m. on the date of the hearing.  If you need “I Love Selby Gardens” materials to show your support (t-shirts, buttons, magnets, or yard signs) please email masterplan@selby.org.  

New Changes to Proposed Restaurant Based on Feedback

The team at Selby Gardens continues to listen and respond to feedback about the Master Plan. In response to concerns about the restaurant, they have made the following changes:

  • Reduced the restaurant area by a minimum of 25 percent
  • Relocated the dining terrace from the south end to the north end of building (along US 41/Mound), while removing the western portion of the terrace
  • Relocated the edible garden from rooftop to restaurant level
  • Eliminated roof elevator access that was necessary for the rooftop edible garden resulting in a seven foot reduction in the highest point of structure

These changes are in addition to the millions of dollars in improvements that they have made to the plan throughout the course of the process as a result of neighborhood input. To learn more about all the changes, please read here

Put your add code here

You must be logged in to post a comment Login